* ** Creating a Constructable Model for Machine Control and Field Layout

$0.00

Trimble: * ** Creating a Constructable Model for Machine Control and Field Layout: Scott Bridges – Trimble: 4:15pm – 5:15pm

Seats Available: 0

Description

Importing CAD data and 3D models into Trimble Business Center with the purpose of verifying the data is ready field applications. We will walk though best practices to create a “Constructable Model” for use in Machine Control systems and for Survey and Construction layout.